COMMERCIAL PROJECTS

From office space to hospital construction we have you covered.  Greco has been designing commercial projects in the Columbia Basin the last 20 years.  He specializes in Design Build HVAC-R projects.  Greco has built a reputation on quality, a couple quick phone calls to commercial contractors in the area will verify his competency.  Call today for your free estimate.    

IMG_3548.JPG

HUTTERIAN BRETHREN 17,500 SQ. FT. COMMUNITY BUILDING

Worked with our client on a 10,000 Sq. Ft. gymnasium with 7,500 Sq. Ft. office space attached.  The building was designed with high efficiency, communicating equipment.  UV bulbs and electronic air filtration was utilized for indoor air quality. ERV's (energy recovery ventilators) were also installed to in increase energy efficiency.

IMG_4898.JPG

SAMARITAN HOSPITAL REMODEL

This particular project was 8 phases. We worked in the the ER Department during an extensive remodel.  The Emergency Room Department remained operational at all times during this project, as we modified existing HVAC systems to meet our clients needs.

IMG_1917.JPG

FEDEX 12,000 SQ. FT. WAREHOUSE

This particular project was designed for delivery vehicles with a 2,000 Sq. Ft. office space attached.  The warehouse was heated and could by high efficiency ERV systems.  Since the warehouse had several delivery trucks parked inside special, designs were made for exhausting emmissions.

Chiller.png

NORWEST PROCESSING PLANT CHILLER PROJECT

We worked with our client to design and install a chiller that would cool essential equipment in their processing plant.

Walk in Cooler.png

TEN PIN 12,000 SQ. FT BREWERY

Installed mechanical systems for a brewery.  The building contained office space, warehouse space, and a 20,000 Sq. Ft. cooler.

Server Installation

SAMARITAN SERVER ROOM

Our client had us install a 15 ton backup cooling system for their server room.  This project had many obstacles to overcome as we were working over expensive equipment and valuable data. Obstacles overcome were limited spacing for duct work, working over running servers, and cutting large penetrations in a concrete roof over the servers.  This project was challenging and successful.